9/10/2024
The construction project committee is working on finalizing finishes. Tile and grout have been selected, and finishes on the exterior EIFS, metal trim, metal doors and metal windows are under consideration. Site work continues and this week’s priorities include:
- Test pit for utilities
- Storm drainage installation
- Blacktop repair at the parking lot storm inlets
9/3/2024
Construction work begins today! The library will remain open for the duration of the project with minimal public disruptions.
- Construction hours will typically take place between 7:30 am-4:00 pm
- A fenced staging area will be located in the rear parking lot
- The first step will be to remove hazardous trees (several dead trees in rear of building)
- Drainage work will begin in the grassy area along Community Way
8/20/2024
The project manual for Phase 1 Renovations was put out to bid on June 21, 2024 and a pre-bid meeting was held on July 9. Sealed bids were received and read aloud on July 18.
The library received 15 bids and awarded 6 contracts:
- Site/Civil: Peter K. Freuh
- Electrical: Upstate Electric
- Painting: Color Code Painting
- Ceramic Tile: Albany Marble
- Storefront: Advanced Glass
- EIFS: Meridian Continental LLC
A project kick-off meeting was held on August 20 and construction is set to begin in early September.
In 2023, the library engaged Hyman Hayes Associates to complete a Building Conditions Survey. The survey aimed to assess the current state of the library facility and devise a five-year plan for Capital Project needs.
Phase 1 Capital Improvements
1. Exterior Envelope Renovations
- Upgrading the Exterior Insulation Finishing System (EIFS) with new mesh, finish coat, and sealants
- Conducting envelope improvements to prevent water intrusion, ensuring the building’s structural integrity and safety
- Installation of a new drainage system around the perimeter of the building, including swails, catch basins, PVC pipes and regrading of the areas surrounding the building to eliminate water entry routes along the foundation
- Removal of trees that impede the ability to complete the EIFS work, as well as trees that are are a safety concern
2. Main Entryway, Windows, and Drive-Thru Window Entry Renovations
- Installing new LED light fixtures, enhancing energy efficiency
- Replacing the gypsum board ceiling in the entryways to maintain structural integrity and aesthetics
- Refinishing the metal breezeways and fabric canopy to improve appearance and durability
- Replacing existing concrete entry sidewalk
- Repair and paint exterior metal doors
- New windows to replace current leaking storefront windows
3. Interior Tile Work
- Addressing safety issues by replacing a portion of the tile in the main lobby area
- Removing non-functioning magnetic book security scanner gates that hinder accessibility and flexibility of space
Phase 1 Construction Project Team
Name | Title | Organization |
Charlie Pensabene | Vice President, Board of Trustees | East Greenbush Community Library |
Dawn Geurds | Business & Operations Manager | East Greenbush Community Library |
Jay Stasack | Senior Associate | Hyman Hayes Associates, LLC |
Jenna Schmonsky | Administrative Assistant | East Greenbush Community Library |
Jill Dugas Hughes | Director | East Greenbush Community Library |
Josh Wainman | President | Wainschaf Associates, Inc |
Phase 2 Capital Improvements
- Roof Replacement
Phase 3 Capital Improvements
- Public Bathroom Renovations